Full Home Renovation Cost in Brisbane: Where to Start

July 2026 · 5 min read

A whole-house renovation touches nearly every trade on our list, flooring, painting, bathrooms, kitchen, sometimes fencing and landscaping too. Here's how to think about scope, order of works, and whether renovating makes sense for your situation.

Renovate or Sell As-Is

Whether a full renovation is worth it depends on your goal. If you're staying long-term, a renovation is about your own quality of life as much as resale value. If you're preparing to sell, it's worth weighing renovation cost against likely uplift in buyer interest, and in some cases a lighter Premium Property Preparation scope makes more sense than a full renovation.

Planning a full renovation and want it managed end to end? See the Premium Property Preparation package →

What Order Renovations Should Happen In

Structural and wet-area work (waterproofing, plumbing, electrical) generally needs to happen before flooring and painting, otherwise you risk damaging finished surfaces during later trades. Kitchens and bathrooms are usually tackled before cosmetic work like painting and flooring in living areas, since they involve more disruption.

  • 1. Structural, plumbing and electrical work
  • 2. Waterproofing and wet areas (bathroom, laundry)
  • 3. Kitchen and cabinetry
  • 4. Flooring and painting
  • 5. Fencing, landscaping and exterior finishing touches

Managing Multiple Trades on One Job

This is where most DIY-managed renovations lose time and money, one trade running late holds up everyone booked in after them, and nobody's actually responsible for the schedule as a whole. Managing every trade under one point of contact and one invoice removes that coordination burden from you.

Questions People Ask

How much does it cost to renovate a whole house in Brisbane?

It varies enormously with scope, from a cosmetic refresh to a full structural renovation. We quote after understanding what you're trying to achieve and seeing the property.

How long does a full home renovation take?

Timeframes depend heavily on scope. A cosmetic refresh (paint, flooring) can take weeks; a full renovation touching kitchen, bathroom and structural work takes longer.

Do I need a builder or can trades manage a home renovation?

It depends on whether structural changes are involved. For scope changes to walls or footprint, a licensed builder is required. For coordinated trade work within the existing structure, a managed multi-trade approach works well.

What order should renovations be done in a house?

Structural and wet-area work first, then kitchen and cabinetry, then flooring and painting, then exterior finishing touches like fencing and landscaping.